Construction of Bridge Connecting Lacuben-Gabut Sur, Badoc, Ilocos Norte (SIPAG Project)
Scope of Work: Bored Piling Installation, Cross Hole Sonic Logging Test on Piles, High Strain Dynamic Test by Pile Driving Analyzer (PDA Test)
Location: Ilocos Norte
Status: Ongoing




